Friday, August 30, 2013

Part 2 Teardrop Build

I've bought new wheel bearings and new tires for my little trailer. I also have painted the entire trailer with Ospho, which is a rust inhibiter, and then sprayed a coat of cold galvanize.  Now lights and wring have been installed.  Next laying out my design and putting the floor and walls up.

I ran my wiring through some plastic conduit. Overkill, I know.


I have started laying the frame for the floor.

I added hidden floor boxes for extra storage.

No comments:

Post a Comment